Question : Problem: Arcserve 11.5 staging different FSD to same tapes

Hello,

I'm using Arcserve 11.5 (client agents, ORACLE agent,tape library option)  and a SONY LIB81 tape library with 8 AIT-3 tapes (100/260GB).
I want to use the staging option of ARCSERVE 11.5 to stage different servers to their own FSD,with their own job, and copy  the different FSDs to the same tapes.
With the 8 tapes I want to do the following rotation :
       Differential backup on MO,TU,WE,TH =>  4 tapes overwritten the next week
       Full backup on FRIDAY, with two set of tapes FR1 and FR2 overwritten after two weeks => 2 tapes
       If the full backup on FR1 and FR2 needs another tape, the remaining 2 tapes should be used.
       The tape(s) of the last friday of the month is(are) used as monthly backup for archiving, and are replaced by 2 new tapes

Can this be done with the staging option?

Thanks, in advance
Xulux

Answer : Problem: Arcserve 11.5 staging different FSD to same tapes

Closed, 500 points refunded.
GranMod
The Experts Exchange
Community Support Moderator of all Ages
Random Solutions  
 
programming4us programming4us