Question : Problem: Arcserve 11.5 staging different FSD to same tapes
|
|
Hello,
I'm using Arcserve 11.5 (client agents, ORACLE agent,tape library option) and a SONY LIB81 tape library with 8 AIT-3 tapes (100/260GB). I want to use the staging option of ARCSERVE 11.5 to stage different servers to their own FSD,with their own job, and copy the different FSDs to the same tapes. With the 8 tapes I want to do the following rotation : Differential backup on MO,TU,WE,TH => 4 tapes overwritten the next week Full backup on FRIDAY, with two set of tapes FR1 and FR2 overwritten after two weeks => 2 tapes If the full backup on FR1 and FR2 needs another tape, the remaining 2 tapes should be used. The tape(s) of the last friday of the month is(are) used as monthly backup for archiving, and are replaced by 2 new tapes
Can this be done with the staging option?
Thanks, in advance Xulux
|
Answer : Problem: Arcserve 11.5 staging different FSD to same tapes
|
|
Closed, 500 points refunded. GranMod The Experts Exchange Community Support Moderator of all Ages
|
|
|
|